Home    

|

    What is Deferum?    

|

    Products    

|

    Benefits    

|

    Locations    

|

    Request A Price    

|

    Links    

|

    Log In    

|

    Contact

Request A DEFERUM Quote - Advanced Form

 

INFORMATION REQUIRED FOR THE DESIGN OF
DEFERUM & AERATOR / DEGASIFIER SYSTEMS

Your qualitative answers will help us to address your specific needs:

Your Intentions






If you selected "Other?" above, please give details:

General

Client name:  
Client’s contacts:  
Address:  
Telephone:  
Fax:  
Email:  
Website:  
     
Nature of the problem (brief description):  
     
Required flow rate for the system in meters, gallons or litres:  
Per day (24 hours):  
Per hour:  
Peak flow rates (per hour):  

Approval

  • Participation in the tender?
  • Do you require approval of the design by a certified / licensed organization?

  • Do you require only technical consultations,
    drawings, media, aerators/degasifiers and start-up of installation:

  • Location for equipment manufacturing:

    • In your country?
    • In Canada?
    • Other?
  • Who will be the General Contractor:
    • Your company?
    • Our company?
    • Other? (e.g., the customer is the general contractor):

Housing / Building

  • Do you require housing/building for the water treatment system?
    • If yes, do you have an existing building to house the system?
    • If yes, how much area is available for the system:
      • Length:
      • Width:
      • Height:

Backwash Of Filters:

  • Backwash discharge to the water drain without cleaning?
  • Backwash discharge to the water drain with cleaning?
  • Zero backwash option required?

.

Raw Water - Well / Bore

  • Distance from the well to the proposed location of the system:
  • Diameter of the pipe from the well to the proposed location of the system:
  • Ground water head pressure with the valve shut off (Pa, Bar or PSI):
  • What is the true output of the existing bore pump:
  • What is the water pressure of the existing bore pump:
  • Maximum level of ground water in the bore location:

Bore / Feed Water

  • Range of bore water temperature in winter: deg.
  • Range of bore water temperature in summer: deg.
  • Does the feed water (to be supplied to the system for
    purification) contain free chloride or any other chemical reagents?
    • If yes, what are their concentrations, now?

Bore Water Analysis

  • Date and time of sampling:
  • Name and contact details of the person who performed sampling:
  • Date and time of water analysis:
  • Name and contact details of the organization / person who carried out water analysis:
  • What is the official conclusion from the analysis results:

Desirable Data

pH:

Two-valent iron (Fe2+):

Three-valent iron (Fe3+):

Manganese:

Alkalinity:

Silicates (SiO3):

Turbidity:

Redox potential, mv:

Calcium (Ca2+):

Ammonia:

Colour:

Free carbon dioxide:

Hydrogen sulphide (H2S):

Dry residue (TSS):

Suspended Solids:

Other contaminants:


Gases - Removal

  • Do you intend to discharge the removed gases into atmosphere?
  • Do you intend to discharge the removed gases into a separate gas treatment system?

Purified Water

  • What are the requirements for the purified water?
  • Is the purified water intended for drinking/potable consumption or for other use? Please confirm:
  • Do you require purified water to be supplied under pressure for further consumption?
    • If yes, at what pressure?
  • Diameter of the pipe?
  • What material of this pipe?
  • Do you have distribution piping in place to supply purified water from the system to the point of use?
  • Do you require purified water to be disinfected?
  • Your choice of disinfectant:
    • Chlorine:
    • Ozone:
    • UV:
    • Calcium Chloride:
    • Hypochlorite:
    • Other:
  • Do you require the system to operate continuously?
  • What is the cost of your current clean water supply, ($ per gallon, litre, or metre cubed):
    • Cost now?
    • Cost expected / acceptable?

Equipment

  • Is there any size, weight, or other restrictions for the system?
    .
  • Material specification for Manufacturing of Installation:
    • Mild Steel (T = 5 mm.)?
    • Stainless steel (T= 5 mm.)?
    • Polypropylene (T = 5 to 10 mm.)?
    • Concrete?

Other?

  • What electrical power supplies are available at the proposed site of the system?
  • Are there any specific requirements for automated components?

General Requirements

  • Requirements for the transportation of the system:
  • Requirements for the installation of the system:
  • Requirements for the commissioning of the system:
  • Requirements for the operation of the system:
  • Requirements for the maintenance of the system:
  • Requirements for the system documentation:
  • Other requirements:

Required Dates

  • Required date for the start of the project:
  • Required date for the completion of the project:

Finance Needs

  • Direct Business Loan:
  • Line of Credit:
  • Leasing:
  • Another:

Other Additional Information

  • What other options have you considered for meeting your requirements?
  • Who are our competitors?
  • The above information was supplied by (please insert your name):
  • Your e-mail address:
  • Your telephone number:

Please contact us after submitting this form to provide any further required information, Schematics, drawings, pictures, e-mail photographs, etc. for this quote.

Home    

|

    What is Deferum?    

|

    Products    

|

    Benefits    

|

    Locations    

|

    Request A Price    

|

    Links    

|

    Log In    

|

    Contact